Activity
From 06/15/2026 to 07/14/2026
Today
- 10:45 AM Request #1028 (in progress (진행)): [LIST #3] GDPR instruments compliance (GDPR 인증)
- 10:43 AM Request #1028: [LIST #3] GDPR instruments compliance (GDPR 인증)
- Man-day Requirement ($300 per Day/Person): 10 weeks (2 persons)
Development Initiation Date: 2026. 06. 10
Devel... - 10:41 AM Request #1028: [LIST #3] GDPR instruments compliance (GDPR 인증)
- [ENERGIUM]
20/05: The work regarding this inquiry is scheduled to be completed by end of October or the begining o... - 10:40 AM Request #1028: [LIST #3] GDPR instruments compliance (GDPR 인증)
- [PEAKS]
03/03: EN doesn't know if it is feasible or not. Still under evalauation about feasibility and schedule.
2... - 10:39 AM Request #1028 (in progress (진행)): [LIST #3] GDPR instruments compliance (GDPR 인증)
- GDPR instruments compliance how the system are GPDR compliance (Labeller, Sorters, and Flextrac)
에너지움 모든 제품군의 소프트웨... - 10:45 AM Request #1025 (in progress (진행)): [LIST #32] HENe refurbish protocol for LABCORP (Labcorp 유지보수 프로그램)
- 10:25 AM Request #1025: [LIST #32] HENe refurbish protocol for LABCORP (Labcorp 유지보수 프로그램)
- [ENERGIUM]
27/04: Min has uploaded a file containing Service Cycle information regarding the criteria you mentione... - 10:24 AM Request #1025: [LIST #32] HENe refurbish protocol for LABCORP (Labcorp 유지보수 프로그램)
- [PEAKS]
29.04: we had a look to the case B. It seems that the system has to be substituted every 1,5 year. Maybe w... - 10:24 AM Request #1025 (in progress (진행)): [LIST #32] HENe refurbish protocol for LABCORP (Labcorp 유지보수 프로그램)
- Every HENe system at LABCORP will perform 800.000-1.000 000 labels per year. We need to understand which should be th...
- 10:36 AM Request #1026: [LIST #60] HENe tube lot traceability (튜브 LOT 추적성)
- Man-day Requirement ($300 per Day/Person): At least 3 weeks
- 10:34 AM Request #1026: [LIST #60] HENe tube lot traceability (튜브 LOT 추적성)
- [ENERGIUM]
10/06: Development complete and testing in progress - 10:34 AM Request #1026: [LIST #60] HENe tube lot traceability (튜브 LOT 추적성)
- [PEAKS]
29.04 Please let us know the schedule - 10:34 AM Request #1026 (in progress (진행)): [LIST #60] HENe tube lot traceability (튜브 LOT 추적성)
- Has the HENe system the tube's lot traceability as HENm?
Is a foundamentl feature to support laboratory ISO 15,189 ... - 10:20 AM Request #1023 (in progress (진행)): [LIST #30] Black Cap color detection (검은색 캡 인식 문제)
- 10:19 AM Request #1023: [LIST #30] Black Cap color detection (검은색 캡 인식 문제)
- Man-day Requirement ($300 per Day/Person): 4 Weeks
- 10:16 AM Request #1023: [LIST #30] Black Cap color detection (검은색 캡 인식 문제)
- [ENERGIUM]
27/03 Received sample tubes and started testing
17/04:
1. HENm/HENd/HENe: Firmware review underway... - 10:16 AM Request #1023: [LIST #30] Black Cap color detection (검은색 캡 인식 문제)
- [PEAKS]
PEAKS have to send them a batch of 100 tubes, even expired, to run the test.
PEAKS have to send the sam... - 10:15 AM Request #1023 (in progress (진행)): [LIST #30] Black Cap color detection (검은색 캡 인식 문제)
- Labelling systems with color cap detection have some problems to detect black cap. They need to conduct additional te...
- 10:13 AM Request #1022: [LIST #25] Labellers Tube Traceability (라벨러 및 튜브 추적성)
- [ENERGIUM]
09/07: Please let us know more detailed information regarding your requirements.
10/07: The latest s... - 10:12 AM Request #1022: [LIST #25] Labellers Tube Traceability (라벨러 및 튜브 추적성)
- [PEAKS]
03/03, PEAKS sent an email requesting a specific modification. EN has to check.
24.03 feasible, under de... - 10:11 AM Request #1022 (in progress (진행)): [LIST #25] Labellers Tube Traceability (라벨러 및 튜브 추적성)
- Labellers Tube Traceability A simpler solution is needed to ensure tubes traceability. At least with HENm (for PMF, S...
- 10:09 AM Request #1021: [LIST #20] Instruments login & PSW (장비 로그인 및 비밀번호)
- Man-day Requirement ($300 per Day/Person): 2 Weeks
Development Initiation Date: 2026. 07. 09
Development Comple... - 10:07 AM Request #1021: [LIST #20] Instruments login & PSW (장비 로그인 및 비밀번호)
- [ENERGIUM]
30/03: If it is needed, development can proceed as a priority.
31/03;
This function is determined to... - 10:06 AM Request #1021: [LIST #20] Instruments login & PSW (장비 로그인 및 비밀번호)
- [PEAKS]
03/03, EN will do it soon. Possible. Need to confirm schedule.
27/04:
ⓐ Please notice Mr. Fabio once ... - 10:05 AM Request #1021 (in progress (진행)): [LIST #20] Instruments login & PSW (장비 로그인 및 비밀번호)
- Instruments login & PSW none of the systems have a login and password at the start of the operation. These are necess...
- 10:02 AM Request #1020: [LIST #18] GNT9 SW modification (GNT9 소프트웨어 수정 요청)
- [ENERGIUM]
23/04: Please share the detailed requirements.
- 10:02 AM Request #1020: [LIST #18] GNT9 SW modification (GNT9 소프트웨어 수정 요청)
- [PEAKS]
03/03: Needed to provide additional info by PEAKS. Fabio has sent specific mail on 02/03
29.04: Once t... - 10:01 AM Request #1020 (in progress (진행)): [LIST #18] GNT9 SW modification (GNT9 소프트웨어 수정 요청)
- GNT9 SW modification AMD needs to do some SW modification on GNT9. They will pay for this. Waiting for better needs e...
- 09:59 AM Request #1018 (in progress (진행)): [LIST #14] FLEXTRAC AIR sponge cleaning capacity (FLEXTRAC AIR 스폰지 클리닝 성능)
- 09:57 AM Request #1018: [LIST #14] FLEXTRAC AIR sponge cleaning capacity (FLEXTRAC AIR 스폰지 클리닝 성능)
- [ENERGIUM]
13/04:
1, The minimum inner diameter of the FTA pipe is 19mm and the size of the pipe cleaning sponge ... - 09:56 AM Request #1018: [LIST #14] FLEXTRAC AIR sponge cleaning capacity (FLEXTRAC AIR 스폰지 클리닝 성능)
- [PEAKS]
EN has to do some test with real blood.
03/03, also EOS has to do the same test
29.04 ok, all the inf... - 09:55 AM Request #1018 (in progress (진행)): [LIST #14] FLEXTRAC AIR sponge cleaning capacity (FLEXTRAC AIR 스폰지 클리닝 성능)
- FLEXTRAC AIR sponge cleaning capacity Sponge to clean up the pipe seems to be too thin. Based on the experience we de...
- 09:49 AM Request #1017: [LIST #12] FLEXTRAC Bulk loader sample overflow (FLEXTRAC 확장형 로더 샘플 오버플로우)
- [ENERGIUM]
Internal meeting completed. Will revert after internal confirmation.
23/04: The sensor can not detect ... - 09:45 AM Request #1017 (in progress (진행)): [LIST #12] FLEXTRAC Bulk loader sample overflow (FLEXTRAC 확장형 로더 샘플 오버플로우)
- 09:41 AM Request #1017: [LIST #12] FLEXTRAC Bulk loader sample overflow (FLEXTRAC 확장형 로더 샘플 오버플로우)
- [PEAKS]
the section is tilted in order to collect the liquid toward the front area, where a sensor detects the prese... - 09:41 AM Request #1017 (in progress (진행)): [LIST #12] FLEXTRAC Bulk loader sample overflow (FLEXTRAC 확장형 로더 샘플 오버플로우)
- FLEXTRAC Bulk loader sample overflow While the TSS has a medium-small collection tank, the Flextrac bulk loader has a...
- 09:28 AM Request #1016: [LIST #9] TSS Drawer Configuration (TSS BIN 세팅 전환 기능 요청)
- Man-day Requirement ($300 per Day/Person): 2 weeks (2 persons)
Development Initiation Date: 2026. 07. 09
Develo... - 09:23 AM Request #1016: [LIST #9] TSS Drawer Configuration (TSS BIN 세팅 전환 기능 요청)
- [ENERGIUM]
Function development possible (applicable to both software and LCD)
Development must proceed by pre-st... - 09:14 AM Request #1016: [LIST #9] TSS Drawer Configuration (TSS BIN 세팅 전환 기능 요청)
- [PEAK]
03/03: feasible but they (EN) don't know how long it takes. Function addition is possible. Need to confirm sc... - 09:07 AM Request #1016 (in progress (진행)): [LIST #9] TSS Drawer Configuration (TSS BIN 세팅 전환 기능 요청)
- TSS Drawer Configuration Possibility to instantly modify drawer names and profiles in the mapping interface used (e.g...