Project

General

Profile

Request #1016

[LIST #9] TSS Drawer Configuration (TSS BIN 세팅 전환 기능 요청)

Added by Kang Min about 2 hours ago. Updated about 1 hour ago.

Status:
in progress (진행)
Priority:
높음 (high)
Assignee:
Start date:
07/14/2026
Due date:
% Done:

0%

Estimated time:

Description

TSS Drawer Configuration Possibility to instantly modify drawer names and profiles in the mapping interface used (e.g. sorting refrigerated samples vs. sorting frozen samples). Example: when using the interface with map A, the drawers are named #1 Serum, #2 EDTA #3 Coagulation, #4 DOA. When switching to the interface with map B, the drawers should instead be named with different name #1 Urine, #2 MAss Spectrometry #3 Immunochemistry, #4 Immunosoppressor . Regarding this point, what would be the impact of setting a different configuration on the system?

매핑 인터페이스에서 Bin 이름 및 프로파일을 즉시 변경할 수 있는 기능 필요 (예: 냉장 샘플 / 냉동 샘플 분류)
매핑 변경 시 Bin 번호 자동 변경 기능 필요 (예: 1-2-3-4 → 5-6-7-8)
구성 변경이 시스템에 미치는 영향 분석 필요

#1

Updated by Kang Min about 2 hours ago

[PEAK]
03/03: feasible but they (EN) don't know how long it takes. Function addition is possible. Need to confirm schedule.

29.04: configuration change have to be possible only when you switch off /swictch on the system. WE have to teach the customer that into bulk loader ther will be only tubes that have to be sorted following the specific rules (otherwise al the tubes will be wrongly sorted

#2

Updated by Kang Min about 2 hours ago

[ENERGIUM]
Function development possible (applicable to both software and LCD)

Development must proceed by pre-storing BIN names by template type in the equipment memory area, and then allowing the user to configure templates in the control program to change the information displayed in the BIN.
(Software and firmware modifications are required)

17/04:
ⓐ Request for confirmation of LCD change method
ⓑ Request for confirmation on how to handle samples if they are input prior to the LCD change
ⓒ Requset for confirmation on whether the responsibility for classification during the sample processing lies with the hospital or Energium

10/07 : The function will be released in mid-August.

#5

Updated by Kang Min about 2 hours ago

Man-day Requirement ($300 per Day/Person): 2 weeks (2 persons)

Development Initiation Date: 2026. 07. 09

Development Completion Date: 2026. 07. 24 (Estimate)

#6

Updated by Kang Min about 1 hour ago

  • Subject changed from TSS Drawer Configuration (TSS BIN 세팅 전환 기능 요청) to [LIST #3] TSS Drawer Configuration (TSS BIN 세팅 전환 기능 요청)
#7

Updated by Kang Min about 1 hour ago

  • Subject changed from [LIST #3] TSS Drawer Configuration (TSS BIN 세팅 전환 기능 요청) to [LIST #9] TSS Drawer Configuration (TSS BIN 세팅 전환 기능 요청)

Also available in: Atom PDF